Sun Plaza Spring key collection: a defect check plan for your flat

Updated 2026-11-19

Sun Plaza Spring is the small BTO bounded by Tampines Street 41 and Tampines Street 42, named after the nearby Sun Plaza Park. It was launched in the August 2022 BTO exercise with 267 flats (150 4-room and 117 5-room) in three 11-storey blocks. HDB's estimated completion was the second quarter of 2026, completion trackers now show it as fully built, and its HDB MyNiceHome roadshow is already listed as past, so owners are collecting keys now or have just done so. Here's how to check your flat properly.

The deadline that matters

Report defects to your Building Service Centre (BSC) within one month of collecting your keys, and before your renovation starts. The 12-month defects liability period covers problems that appear later, but the first month is when it's easiest to show a defect was there from the start.

Check the windows with road noise in mind

Launch reviews noted that the Tampines Expressway (TPE) and the Pan-Island Expressway (PIE) are only a couple of streets away, and Gongshang Primary School sits right in front of the project. Some flats will hear traffic or school bells. Windows that close tightly make a real difference, and seal problems are much easier to get fixed now than after the curtains and grilles go up.

More in how to check windows at key collection.

Eleven storeys: check the ceiling if you're on the top floor

With only 11 storeys, a bigger share of flats sit right under the roof than in a 30-storey block. If yours is on the top floor, look closely at the ceilings for stains, bubbling paint or damp patches, especially in the corners and near the windows. If you can, go back after heavy rain in the first few weeks. For everyone else, check the ceilings next to the bathrooms and kitchen for the same signs, since they sit under the flat above. See ceiling leaks and water seepage.

A 4-room or 5-room flat takes time

Every flat here is a 4-room or 5-room flat, so you have two bathrooms, a kitchen, a service yard and a lot of floor tiles to check. Give it two to three hours in daylight and bring a second person: one taps and tests, the other tapes and takes photos.

Getting there and what to bring

Launch reviews put Tampines East MRT about an eight-minute walk away, and Tampines MRT about 15 minutes. The project has a multi-storey car park with a roof garden and its own childcare centre, but common areas may still be getting final touches when you first collect keys.

Pack painter's tape, a marker, a coin, a bottle of water for the drain test, and a charger. Full list: what to bring on key collection day.

A simple plan for the first visit

  1. Go room by room. In each room: floor, walls, ceiling, doors, windows, sockets, then anything with water. Finish one room before moving on.
  2. Number each defect on tape (#01, #02…), then take one close-up and one wide photo with the number showing. The BSC uses the numbers to find each spot.
  3. Mark them on a floor plan. A quick sketch with the numbers on it saves the contractor time and saves you a second visit.
  4. Write one clean list, grouped by room, and submit it within the month. Check the repairs when they're done and report anything that wasn't fixed.

Every room and what to check is in the room-by-room BTO defect checklist. Prefer paper? There's a free printable version with tick boxes and number labels. Or use the free KeyDay app on your phone: it numbers each defect, keeps the photos with it and marks it on your floor plan. How to hand the list in: how to report BTO defects to the BSC.

After the first month

Tiles can turn hollow and hairline cracks can appear over the first year. Do a second round before the 12 months are up: the one-year DLP check. Renovating? Check the contractor's work before the final payment with the renovation handover checklist.

Other Tampines owners are collecting keys too: see the Tampines GreenQuartz check, or the full BTO key collection list.